• Home
  • Who
    • #
    • About Us
      • Who We Are
      • Meet the Partners
      • Become A BRCA Partner
      • Join Our Email List
      • Our Green Pages Directory
  • What
    • #
    • Mission, Vision, and Goals
      • Stewardship Principles
      • Issues
      • Work Groups
      • Events
  • Where
    • #
    • Focus Area
      • Focus Area Map
      • Interactive Story Map
  • News
    • #
    • News
      • Events Calendar
      • BRCA News
      • Sign up for eNews
  • Resources
    • Video Library
    • Webinars and Presentations
    • Maps
    • All Resources
info@blueridgeconservation.org
Events
Blue Ridge Conservation AllianceBlue Ridge Conservation Alliance
  • Home
  • Who
    • OUR PARTNERS represent the most active conservation groups in the upper Shenandoah Valley
    • About Us
      • Who We Are
      • Meet the Partners
      • Become A BRCA Partner
      • Join Our Email List
      • Our Green Pages Directory
  • What
    • OUR MISSION is to preserve and protect the natural resources of the Blue Ridge
    • Mission, Vision, and Goals
      • Stewardship Principles
      • Issues
      • Work Groups
      • Events
  • Where
    • OUR FOCUS is the highly-threatened region from Shenandoah National Park to the Potomac River
    • Focus Area
      • Focus Area Map
      • Interactive Story Map
  • News
    • NEWS & UPDATES from our alliance and our partners.
    • News
      • Events Calendar
      • BRCA News
      • Sign up for eNews
  • Resources
    • Video Library
    • Webinars and Presentations
    • Maps
    • All Resources

News

GCA Comments on Loudoun Draft Natural and Environmental Resources Protection Standards 5.03.01 and 5.03.02

Alliance Partners, Goose Creek Association |

Goose Creek Association comments on Draft Natural and Environmental Resources Protection Standards: 5.03.01 and .02: River and Stream Corridor Resources

Table 5.03.01-1: We appreciate that Goose Creek is denoted as a Scenic River; however, please note that the North Fork of the Goose Creek is not so designated. The North Fork watershed constitutes approximately 65,000 acres in Loudoun County. It originates in the Blue Ridge Mountains and flows through regions of agricultural land as well as urban and suburban land, including the towns of Round Hill, Purcellville, and Hamilton, and the villages of Saint Louis, Philomont, and Bluemont. We would like to see the North Fork added to the table to be protected by the same standards as the Scenic Rivers, Potomac, and Bull Run. The illustration of the North Fork of the Goose Creek from the Loudoun County GIS mapping service is included with this correspondence. In addition:

  • Illustrations would be very helpful.
  • How do you determine what is a stream and if it drains 100 acres?
  • 50’ on each side of flood plain? (presume resource protection area)
  • 03.02 – Indicates no land disturbing activities but then indicates “Encourage innovative and imaginative building techniques to create structures and site plans that are suited to sloped terrain.” This seems to suggest developers can develop in the steep slope areas provided they are innovative and imaginative. We think this sentence should be deleted.
  • 03.04.B.2.g  – Discusses the use of blasting for sewer and water on steep slopes. It requires that blasting follow standard procedures, but we need to limit the magnitude of blasts to limit the disturbance and damage to the environment. In karst areas, we recommend limiting particle acceleration from blasts to be no more than 2 inches/sec, and that blasting be monitored by use of seismographs to confirm the particle acceleration is not exceeded.
  • 03.04.B.2.k – Recommends the use of 2 super silt fences in steep slope areas. This is inadequate. We should recommend a 25 feet vegetated buffer be required after the 2 layers of super silt fence. We should also require that storm water management designs limit the amount of storm water runoff that flows over steep slopes.
  • Table 5.03.03 appears to indicate active recreation within the River and Stream Corridor Resources (RSCR) is permitted. We think the recreation should be limited to passive in the RSCR. It also indicates active recreation by special exception if the use uniquely requires a site within a RSCR adjacent to steep slopes or very steep slopes and the applicant can demonstrate the proposed use is not compatible with a site that lacks RSCR or very steep slope areas.  This section is worded almost as if as long as the developer can say “we have to utilize the RSCR/slopes for this active recreation and can’t put it anywhere else” that they have met the requirement. We shouldn’t have active recreation in these areas in any case. If we really want to protect these areas, we may have to realize that not every site can be developed without damaging the RSCR or steep slopes.
  • Table 5.03.04-1 NERS Table. Item #2 indicates Storm Water Management (SWM) in RSCR/slope areas must be in accordance with chapter 1096 of codified code and Facilities Standards Manual (FSM). I do not have access to the SWM requirements for steep slopes in the FSM, but they were probably developed a long time ago and have not changed much. We need state of the art SWM in our RSCR/Steep slope areas. Why are we settling for standards in the FSM that were developed prior to understanding the detrimental impacts of development on our sensitive environmental areas?
  • Table 5.03.04-1 NERS Table. Item  #8 – Siting and disturbance – Indicates land disturbance must have minimal adverse effects on water quality and erosion. This is extremely vague. The impact on water quality and erosion can be easily measured now with automatic water monitoring equipment. There should be a requirement to obtain baseline water quality information, on-going monitoring during the land disturbance, and a report with a summary of test data from a professional engineer who verifies no negative impact on water quality and erosion has occurred.
  • Table 5.03.04-1 NERS Table. Item 9 – Requires permeable surfaces be used. However, it has been clearly demonstrated that without maintenance, permeable surfaces clog very quickly and stop functioning soon after they are installed. In order for permeable surfaces to function over time, there must be a requirement for periodic maintenance/cleaning of the permeable surfaces with annual reports confirming the maintenance has been completed.

 

With sincere appreciation,

 

Paul Lawrence                                                            Lori Keenan McGuinness

Co-Chairman, Loudoun                                              Co-Chairman, Fauquier

 

0

You also might be interested in

Friends of the Blue Ridge Mountains

FBRM President Sends Letter of Concern On Suspending Zoning Enforcement Lawsuit

Apr 24, 2025

Last week, Peter Weeks, President of Friends of the Blue[...]

Tips for New Birdathon Teams

Tips for New Birdathon Teams

Mar 25, 2022

by Gerco Hoogeweg, Raven Loonatics Birdathon Team Member If you’re[...]

Top Stories: Brandy Station Battlefield, Loudoun Comprehensive Plan and more

Top Stories: Brandy Station Battlefield, Loudoun Comprehensive Plan and more

Oct 18, 2018

The Piedmont News - Top Stories PEC has four major[...]

Alliance Partners

  • Appalachian Trail Conservancy
  • Blue Ridge Watershed Coalition
  • Changing Landscapes Initiative
  • Friends of the Blue Ridge Mountains
  • Goose Creek Association
  • Friends of the Shenandoah River
  • Land Trust of the Eastern Panhandle
  • Land Trust of Virginia
  • Loudoun Wildlife Conservancy
  • Piedmont Environmental Council
  • Potomac Appalachian Trail Club
  • The Downstream Project
  • Virginia Working Landscapes

Loudoun Wildlife Conservancy

  • Data Centers in the Town of Orange? Protecting Our Small-Town Character The Piedmont Environmental Council (PEC) is working closely with residents...
    Read more
  • Piedmont Mobility Alliance Convenes Summit to Advocate for Better Community Access to the Great Outdoors The Piedmont Mobility Alliance will convene the sixth annual Active...
    Read more
  • An Electric Super-Highway Through the Piedmont Joining the list of new energy and infrastructure proposals across...
    Read more
  • An Electric Super-Highway Through the Piedmont Joining the list of new energy and infrastructure proposals across...
    Read more
  • 2026 Work Days at JK Black Oak Wildlife Sanctuary Before getting started, Gerco briefs volunteers. Photo by SA Ferguson...
    Read more

Contact Us

We're currently offline. Send us an email and we'll get back to you, asap.

Join Us Today! Learn More

Contact Us

  • (540) 955-6066
  • info@blueridgeconservation.org
BRCA monthly e-Newsletter

E-NEWSLETTER

Our e-Newsletter will keep you in-the-know on regional conservation Action Events and News from our Partner Organizations).

Sign Up

SOCIALIZE

Follow us on social media

© 2026 · Blue Ridge Conservation Alliance • network website powered by The Downstream Project

Prev Next

Press Enter to search · Esc to close